This versatile double-ended training lead features a stunning butterfly pattern in blue and purple hues. Designed for hands-free use, it can be worn crossbody, offering convenience and control during walks or training sessions. The lead includes rose gold hardware and two sturdy clasps for attaching to different points, providing multiple configuration options for training and everyday use. Perfect for pet owners seeking both style and functionality.
Double Ended Training Lead |Hands Free - Crossbody Dog Lead | Butterfly Ballet
Double Ended Training Lead | Hands-free dog lead | Butterfly Ballet-Dizzy Dog Collars
Double Ended Training Lead | Hands-free dog lead | Butterfly Ballet-Dizzy Dog Collars
Double Ended Training Lead | Hands-free dog lead | Butterfly Ballet-Dizzy Dog Collars

Double Ended Training Lead |Hands Free - Crossbody Dog Lead | Butterfly Ballet

Regular price$240.56
/
Tax included. Shipping calculated at checkout.

 

This double-ended dog leash can be used in a variety of ways. It has two snap hooks and four D-Rings so it can be used as a short or long leash, over the shoulder or around the waist.

The premium padded length provides maximum comfort for the handler.

The full length is 2.1m with a strong snap hook on each end and 4 x D-Rings along the lead’s length. The entire leash is padded with neoprene for your comfort.

The lead length is adjustable and can also be used as a temporary tether.

A kaleidoscope of delightful blue and purple butterflies taking flight. Our Butterfly Ballet pattern is vibrant and pretty, bringing a touch of happiness and beauty to your day!

Click here for matching items.

 

Shop All

Dog Harnesses

Dog Collars & Leads

Bows & Bandanas

Poop Bag Holders

Travel


Recently viewed