Peachy Posies LONG LEAD | Canvas & Neoprene | Premium Quality Fully Padded Leash-Leash-Dizzy Dog Collars
Peachy Posies LONG LEAD | Canvas & Neoprene | Premium Quality Fully Padded Leash-Leash-Dizzy Dog Collars
Peachy Posies LONG LEAD | Canvas & Neoprene | Premium Quality Fully Padded Leash-Leash-Dizzy Dog Collars

Peachy Posies LONG LEAD | Canvas & Neoprene | Premium Quality Fully Padded Leash

Regular price€27,31
/
Tax included.
Size

Peachy Posies Long Lead

Enjoy extended walks with our Peachy Posies Long Lead, designed for comfort and style. With its beautiful floral pattern and high-quality construction, this lead is perfect for everyday outings and training sessions. Machine washable and easy to keep clean, it maintains its vibrant look walk after walk. Crafted from strong yet soft canvas, the lead is padded with neoprene along its entire length, providing a comfortable grip and added control.

Key Features:

  • High-Quality Construction: Made with a durable, soft canvas that withstands regular use.
  • Extra Traffic Handle: Located near the snap hook for enhanced control in high-traffic situations.
  • Full-Length Neoprene Padding: Provides comfort for your hand, making longer walks more enjoyable.
  • Generous Length: 210cm total length, including handle and snap hook, offers more freedom for your dog to explore.
  • Convenient D-Ring: Positioned under the handle, perfect for attaching a poop bag holder or other accessories.
  • Available Widths: Choose from 2cm or 2.5cm widths to suit different dog sizes.

Suitable for Different Dog Sizes:

  • 2 cm Width: Suitable for medium-sized dogs like Cocker Spaniels, Beagles, and French Bulldogs.
  • 2.5 cm Width: Ideal for larger breeds such as Labradors, German Shepherds, and Golden Retrievers.

Complete the Look: Pair this long lead with matching accessories from our Peachy Posies Collection:

Customer Reviews

Based on 179 reviews
98%
(176)
2%
(3)
0%
(0)
0%
(0)
0%
(0)
M
Michelle W.
Very cute dog lead and collar

Well made and good for my puppy. Great design.

S
Sheridan A.
Pretty little butterflies!

Perfect length leash, and we got lots of comments on the collar and leash set.
Padded leash provides quality strength. 10/10

J
Julie-Ann W.
Sherbet Gingham Dog Leash and Collars

Love the colours and quality, just waiting for my pup to be old enough to go out in public 😊

L
Lindsay D.
Matches my brown dog

I love this company and have ordered a few times. My dog is brown and all my previous ones were black, which goes with anything. This harness is pretty and goes with my dog.

Shop All

Dog Harnesses

Dog Collars & Leads

Bows & Bandanas

Poop Bag Holders

Travel


Recently viewed