Peachy Posies LONG LEAD | Canvas & Neoprene | Premium Quality Fully Padded Leash-Leash-Dizzy Dog Collars
Peachy Posies LONG LEAD | Canvas & Neoprene | Premium Quality Fully Padded Leash-Leash-Dizzy Dog Collars
Peachy Posies LONG LEAD | Canvas & Neoprene | Premium Quality Fully Padded Leash-Leash-Dizzy Dog Collars

Peachy Posies LONG LEAD | Canvas & Neoprene | Premium Quality Fully Padded Leash

Regular price€17,19
/
Tax included.
Size

Peachy Posies Long Lead

Enjoy extended walks with our Peachy Posies Long Lead, designed for comfort and style. With its beautiful floral pattern and high-quality construction, this lead is perfect for everyday outings and training sessions. Machine washable and easy to keep clean, it maintains its vibrant look walk after walk. Crafted from strong yet soft canvas, the lead is padded with neoprene along its entire length, providing a comfortable grip and added control.

Key Features:

  • High-Quality Construction: Made with a durable, soft canvas that withstands regular use.
  • Extra Traffic Handle: Located near the snap hook for enhanced control in high-traffic situations.
  • Full-Length Neoprene Padding: Provides comfort for your hand, making longer walks more enjoyable.
  • Generous Length: 210cm total length, including handle and snap hook, offers more freedom for your dog to explore.
  • Convenient D-Ring: Positioned under the handle, perfect for attaching a poop bag holder or other accessories.
  • Available Widths: Choose from 2cm or 2.5cm widths to suit different dog sizes.

Suitable for Different Dog Sizes:

  • 2 cm Width: Suitable for medium-sized dogs like Cocker Spaniels, Beagles, and French Bulldogs.
  • 2.5 cm Width: Ideal for larger breeds such as Labradors, German Shepherds, and Golden Retrievers.

Complete the Look: Pair this long lead with matching accessories from our Peachy Posies Collection:

Customer Reviews

Based on 195 reviews
98%
(192)
2%
(3)
0%
(0)
0%
(0)
0%
(0)
A
Alana
Gingham Checks on point

Fabulous is all I can say…new collar, harness and lead for my lil man Angus and lil girl Evie. They look PAW-some!
Super quality, great sizing. These two have always been head turners but they’ll stop traffic now! Stylin!!

J
Julie C.
Love it

Fabulous well made leash soft enough in my hands and I love the locking clip for that extra bit of security to keep my whippet safe. Thank you

A
Autumn M.
Beautiful

I love the colours in this and it is so light to hold you forget its even there

A
Ann-maree B.
Unicorn Leash and collar

Beautifully crafted from quality materials with great designs.

Shop All

Dog Harnesses

Dog Collars & Leads

Bows & Bandanas

Poop Bag Holders

Travel


Recently viewed